Tuesday, May 8, 2012

Calculating Triangle Angles and Trigonometric Values

To analyze a truss there is often a good deal of trigonometry involved to calculate the components of forces.  To make things simpler (I hope), I’ve created a simple excel spreadsheet that will allow you to calculate angles, sines, cosines, and tangents if you know the length of the legs of any triangle.  This should ease the calculation burden somewhat.  You might well wish to use this sheet as a starting point to make your truss calculations even readily modifiable.

Here’s the link to the spreadsheet.

Download the spreadsheet to Excel to see the diagram that explains the notation.

Friday, May 4, 2012

Week-6 Bridge Results Recording

Before you leave the lab in Week-6 we’d like you to record the results of your bridge test along with the characteristics of your bridge.  We’ve set up the linked Google Docs Form to submit it.

We’ll show the results in class or summarize them in the blog.

Note that this form is very much like the one you’ll be asked to complete for week-9 to PREDICT the results for your final bridge.

Thursday, May 3, 2012

Late submissions to Bb Vista

Over the past few weeks Dr. Mitchell, Deepak, and I have noticed a large portion of our inboxes dedicated to students either forgetting to submit their course assignments on Bb Vista, submitting the wrong links, or something related. We have decided that we will no longer allow for corrections to submissions or submissions of assignments, blog posts, and etc past the due date times as set forth on Bb Vista.

This will go into affect officially next week. To help avoid problems in your assignment submissions, take note of the following:
  1. Stay Up to Date:There is something due every week in Bb Vista for our course. The Bb Vista assignments don't show up however until a week before they are due. You should be checking the course Bb Vista site every week to stay updated on everything.
  2. Check your Hyperlinks: Make sure you check your hyperlinks before you submit them. A lot of you end up submitting links to the blog post editor or to the blog post preview. These will not work for anyone except for you. Try following the hyperlinks in a different browser, or even following them after signing out of your Google account.
  3. Resubmissions Before Due Date: If you submit early and notice a mistake, you can still take your assignment, modify, and resubmit. This will only work however if it is done before the assignment due date. I've set it up in Bb Vista so that every single one of your assignments is due on a Wednesday at 9AM. The only variable is the week in which each assignment is due.
If you have trouble submitting or if Bb Vista is acting strangely, feel free to email anyone of us before the due date and we will gladly assist.

Bridge over CSX Tracks–Photos

You can see the photos I took this morning when the bridge was put in place over the CSX tracks.

Picasaweb Photos

Wednesday, May 2, 2012

Truss Bridge Installation Wednesday Night and Thursday AM May 2nd and 3rd

Here’s a news release from the Schuylkill River Parks Alliance that may be of considerable interest to this class.  It’s tonight and tomorrow morning!

Truss of Connector Bridge

The delivery of the truss portion of the bicycle-pedestrian bridge that will span the CSX tracks between Locust and Spruce streets is supposed to be delivered overnight Wednesday, May 2nd into the early morning of Thursday, May 3rd. The Philadelphia Streets Department will use the Swift Reach  telephone system to notify residents along the route. The contents of the message is below in italics.

Rockport, the contractor, expects that it will take approximately one hour to assemble the truss Thursday morning, then it is going to set the bridge into place between 8:30 AM and 9:00 AM.

The telephone Swift Reach message from the Streets Department:
Philadelphia Departments of Streets and Parks & Recreation is pleased to announce the delivery of the new Truss Bridge that will soon connect the Schuylkill River Park between Spruce and Pine Streets to the Schuylkill River Trail. Truss bridge is scheduled to arrive at the project site on late Wednesday night into early Thursday morning. Bridge will be escorted to the project site by Philadelphia Truck Enforcement unit and transported on two (2) oversized hauling trucks. In order to safely make the move, temporary parking restrictions will be posted along the trucking route, and will be effective from Wednesday, May 2nd at 10pm through Thursday, May 3rd at 7am. No parking signs will be posted at the intersections of Washington Avenue and 22nd Streets and 22nd and Locust Streets, as well as along Locust Street between 22nd and 25th Streets.

Tuesday, May 1, 2012

Truss Bill of Materials Typo Correction

Question:

I think there is an error in the excel spreadsheet that calculates the bridge cost. The member length after 1.25 should be 2.125 instead of 1.125 correct?

Response:

Indeed there is a typo in the Truss Bill of Materials.  Part #2 should be 2.125” in length rather than the 1.125” indicated in the description.

I corrected it on the server at about 7:15 on 5/1/2012

The cost is still correct.

Wednesday, April 25, 2012

Real Bridges – California’s New Bay Bridge

This video from Science Friday isn’t directly about trusses (but notice the use of trusses in the construction), but it’s interesting to see the kinds of things that engineers incorporate to make bridges safe.

As the video indicates, the previous bridge in this location failed during the 1989 Loma Prieta earthquake.

Note the time scale for big projects of this sort – it’s 23 years since the failure and the replacement is just about to open.